3 roller plate bending machine

The startup inspection of the 3 roller plate bending machine is crucial to ensure the normal operation of the equipment and the safety of the operators.The following are the specific steps and precautions for the start-up inspection of the 3 roller plate bending machine:
1、Equipment inspection

After connecting the power,first let the lower roller move in both directions to check if it runs smoothly and without any abnormal noise.At the same time,make the upper roller move up and down to check for any jamming or poor operation.Check for any abnormalities in all components,especially ensuring that the fastening screws(caps)are not loose.The brake should be normal and reliable,ensuring quick braking in emergency situations.Check the lubrication condition of the equipment and add lubricating oil to other parts according to the markings on the lubrication table.The lubricating oil used should be of good quality and free of sediment to ensure the lubrication effect during equipment operation.

3 roller plate bending machine

2、Preparation of operating environment
When using a crane to lift steel plates or drums,it is necessary to ensure that there is no collision with the 3 roller plate bending machine to avoid damaging the equipment or causing safety hazards.The area around the 3 roller plate bending machine should be kept clean and free of debris to avoid affecting the normal operation of the equipment or causing accidents such as tripping of operators.
3、Safety precautions
During the rolling process,hands must not be placed on the rolled steel plate,and samples are not allowed to be used for inspection.After stopping the machine,use a template to check the roundness to prevent accidents.The workpiece must be placed steadily and in the correct position before it can be driven for operation,and clear signals should be provided.A designated person should be assigned to command to ensure coordinated and consistent operation.When rolling narrow simplified characters,they should be placed in the middle of the rolling mill to prevent hands and clothes from being rolled into the rolling mill.
4、Shutdown and maintenance
If any abnormal noise is found during the operation of the machine tool,it should be stopped immediately for inspection,adjustment,and repair to prevent the fault from expanding.After shutdown,the workpiece should be placed in the designated location and the equipment power should be turned off to ensure safety.Regularly maintain and upkeep the equipment,including checking the wear and tear of the V-belt,handle,knob,buttons,etc.If there is severe wear,it should be replaced in a timely manner.After shutdown,it is necessary to add lubricating oil to the machine tool and wipe it clean to avoid rust and dust accumulation.
In summary,the startup inspection of the 3 roller plate bending machine involves multiple aspects such as equipment inspection,preparation of operating environment,safety precautions,and shutdown and maintenance.Only through comprehensive and meticulous inspection and preparation can the normal operation of the 3 roller plate bending machine and the safety of the operators be ensured.
Previous : No more
Next: Cone roller machine manufacturer
Contact
 Address:Room 1202, Detaitang Building, No. 118 Huaguang Road, Zhangdian District, Zibo, Shandong
 WhatsApp:+8615653328535
 Wechat: +8615965331535
 E-mail:zs@sdsmachinery.com
亚洲国产精品自在拍在线播放蜜臀| 毛片一| 亚洲一二三区成人无码| 久久精品国产99国产电影网| 国产精品VIDEOSSEX久久发布| 又色又爽又黄又无遮挡网站 | 白嫩少妇bbwbbw撒尿| 1级黄色片| 中文字幕熟女人妻另类癖好| 亚洲精品无码专区在线在线播放 | 日韩免费看| 丰满老师引诱我进她身体| 日韩精品无码免费专区午夜| 久久精品日日躁夜夜躁欧美| 亚洲精品国产美女久久久| 国内精品久久久久电影院| 国内精品久久久久久久影视| 中文字幕AV无码一区二区三区| 国产成人无码AV在线播放DVD| 国产综合久久久久| 亚洲日韩欧美一区二区三区在线 | 区。| 蜜桃1| 枣庄市| 国产午夜视频在线观看| 观看国产色欲色欲色欲www | 人妻少妇中文字幕| gogo大胆少妇大胆艺术| 欧洲亚洲一区| 国产AV夜夜欢一区二区三区| 在线观看热码亚洲av每日更新| 欧美精品亚洲精品日韩专区va| 国产精品18久久久久久麻辣| 伊人久久婷婷五月综合97色| 国产精品亚洲一区二区三区在线| 亚洲最大av无码国产| 国产高清乱码又大又圆| 黑人巨大粗物挺进了少妇| 国产精品久久久久久AV福利| 老司机亚洲精品影院无码| 久久久精品人妻一区二区三区四 |